22 December 2004


Home | Previous | Next
22/12/2004
Contacted Peter Karanges re site visit. Requested I phone him on 26/12/04 to arrange a time, but OK to start in the meantime.
One main wheel assembled. Sleeves manufactured for trim assembly from bundy pipe. Aluminium rivets to trim assembly as per diagram.
Concealed lugs for ventral fin installed, and front section of ventral fin prepared for bonding. Trim horn tacked and filleted with 5min epoxy and flock.
Temperature: 30 degrees. Relative Humidity 70%.

Time: 8 hours
Total Time: 24 hours