23 July 2005
Home
| Previous | Next
23/7/2005
Trimmed and sanded left aileron channel.
Cut right wing aileron clamp inspection hatch and fuel drain hole.
Prepared right wing for glassing and bonding of premold strip.
Time: 5 hours
Total Time: 287 hours
Home
| Previous | Next