18 September 2005


Home | Previous | Next
18/9/2005
T.C. visit from Peter Karanges.
- Need to build down and up elevator end caps, and build out right end cap with Q-cells.
- Need to move elevator control clamp forward from factory drilled position to achieve full elevator travel.
- Peter has found good article on finishing composite aircraft at www.curedcomposites.netfirms.com/finish.html.
- He suggested looking at Frontrunner carpet for the interior trim.

Attached lower cowl to fuselage and upper cowl camloc x1,

Time: 9 hours
Total Time: 341 hours



Home | Previous | Next