11 December 2005


Home | Previous | Next
11/12/2005
Replaced lugs on supplied engine earth lead with smaller diameter ones to suit battery terminal and engine earth bolt, and attached lead to engine.
Prepared right rear window for bonding.
Installed grommets for header tank lines, and mounted header tank with velcro and neoprene.

Time: 5 hours
Total Time: 478 hours



Home | Previous | Next