01 January 2006
Home
| Previous | Next
1/1/06
Laid up right cabin air duct mounting side and left cabin air duct mounting top, all with four layers.
Repaired cargo door window frame with Q-cells and 3 layers of tape. (Had buckled during shaping of door.)
Trial fitted windscreen and remaining windows.
Fitted right and left 1/4 inch aluminium tube cowl pin conduits to cabin.
Time: 6 hours
Total Time: 492 hours





Home
| Previous | Next