18 March 2006


Home | Previous | Next
18/3/2006
Flocked left rear window.
Installed 5/16" fuel and vent pipes in left door pillar, however there is not a safe clearance between these and the rear door hinge.
I will enlarge the cavity with PVC door jam material.
Began work on regulator wiring.

Time: 5 hours
Total Time: 556 hours



Home | Previous | Next